Wellfield Expansion - Phase III
Beginning in 2004, due to the increasing decline of Lake Meredith, the
Authority began acquiring additional water rights in Gray, Hutchinson,
Roberts, and Wheeler Counties. In 2007, the Authority finished
its water rights pursuit and has become one of the largest water rights
owners in Texas.
The Phase III wellfield area is located about 18 miles
northeast of Pampa, TX. It is comprised of 15 high capacity wells,
12.7 miles of 54" transmission pipeline, and 13 miles of collection
pipelines.
The transmission pipeline ties into Pump Station 21, which is located
about 12 miles to the west
in the Phase I wellfield area.
The wellfield is being constructed in two phases. The first phase
consists of 6 high capacity wells, which are expected to be operational
by the early summer of 2010. They will range in capacity from 1000
gpm to 2880 gpm.
The second phase consists of 9 high capacity wells, which are expected
to be operational shortly thereafter. They will range in capacity
from 1200 gpm to 2880 gpm.
Phase III prototype well being drilled by Henkle Drilling.